GES Hamriyah (SRS)
Overview
In October 2018, we closed a transaction to develop a Greenfield terminal in Hamriyah Free Zone, Sharjah, UAE. The terminal was completed in the summer of 2020 with a capacity of 178,640 cubic meters.
Technical Overview
CAPACITY
c.178,646m3
TANKS
23 no. above ground, API 650 tanks, A mix of CS / SS, dependent on service, fitted with IFR or heating coils / insulation
PRODUCTS
Bitumen, Fuel oils, Gasoils, Gasoline, Petrochemicals
VAPOUR RECOVERY
Yes, Gasoline road loading
PIPELINES
Multiple pipelines to both jetties. All lines fitted with cleaning scrappers
JETTIES
Inner harbour, 6.5m draft and main harbour, 14m draft
BLENDING
In tank jet mixers and static paddle mixers. Injection systems for blend components available
Facilities
- Connectivity to inner harbour and main harbour
- Truck loading / unloading
- Multiple pumps allowing simultaneous operations
- Segregated piping systems
- Heating and mixing systems